DESIGN.md
The building as it currently stands, and why. Diagram-level: every
dimension is a placeholder until a drawing says otherwise. Change this
file when a decision changes.
Site
From DCAD 2026 and USGS lidar; nothing surveyed.
- Lot: 2.02 acres, a slanted strip about 160 ft wide
at the top and 250 ft wide at Commerce, about 445 ft long, running
downhill on a bearing of about 24° (NNE).
- Ground: three parts down the middle of the lot. A
flat top at about 541 ft at the south line by the cul-de-sac. A bluff
that falls 65 ft over the next 260 ft, about 25% on average. A flat pad
at about 470 ft for the last 180 ft to Commerce, where the 1985
warehouse (24,536 sf) sits.
- View: downtown is 3.3 to 3.8 miles away on a
bearing of 84–89°, almost due east, and fills about 15° of the horizon.
The slope faces NNE, about 60° off that, over the rail corridor and the
Trinity. The land hides nothing of downtown from any level of the tower
(
diagrams/1_site/view.svg); trees and neighboring roofs are
unchecked.
Brief
What the building should be like, as stated so far.
- From outside: industrial and a little intimidating,
at least until you reach the bridge and probably there too. Somewhat
disguised from the cul-de-sac. Nothing delicate; it has to hold its own
in the neighborhood.
- Geometry: subtractive, like the Waechter house:
openings and the entry cut out of one plain block.
- Solid back, open front: closed toward the
cul-de-sac, open toward the river and downtown.
- Dressed like the neighbors: steel, concrete, the
vocabulary of sheds and warehouses.
- Inside: simple. One room per floor with the
services in the wall.
- Three units that contrast: loft A, loft B and the
work space could differ significantly from one another.
- The machinery that builds it stays in it. Whatever
lifts the building's parts into place (a hoist, a crane rail) is built
into the building and remains as its working equipment.
- Both lofts get a view. The middle loft (A) gets a
balcony; the top loft (B) gets a habitable roof.
Decisions
1. The tower stands just over the brow, 50 ft in from the
cul-de-sac line. The lot line is the crest; there is no flat
top to build on. At 50 ft in, the ground is about 13 ft below the
street, one tall storey. Further down, every foot of slope is a foot of
tower to build back, and the bridge becomes the main structure.
(diagrams/2_placement/section.svg)
2. You enter by a level bridge, 50 ft long, at street
elevation (541 ft). The bridge makes the tower a freestanding
object rather than a building at the curb, and puts the entry one level
above the ground the tower stands on.
3. One face looks down the slope to the river (10°), one
looks east to downtown (100°). The hill and the skyline are 60°
apart, so the tower is turned to give each a face. This happens to run
parallel to the west lot line. Turning it a further 20°
counter-clockwise would aim the east face straight at the skyline;
undecided.
4. Footprint 28 × 24 ft, as four bays of 14 × 12 ft.
14 ft runs east–west, 12 ft north–south. The south-west bay, where the
bridge lands, is the stair on every level. The rooms this makes are
tight; the size is being kept minimal on purpose for now. The next step
up would be 16 × 14 ft bays (32 × 28 ft).
5. Five levels: a work level below the bridge and four 11 ft
levels from the bridge up.
| Level |
Floor elevation |
Use |
| Roof |
585 ft |
44 ft above the street, 114 ft above the Commerce pad |
| 4 |
574 ft |
loft B |
| 3 |
563 ft |
loft B |
| 2 |
552 ft |
loft A and loft B |
| 1 (bridge) |
541 ft |
loft A, landing, stair |
| Work |
526 ft |
work space at bluff grade, 15 ft high |
The tower is 63 ft tall from the work floor to the parapet.
6. The two lofts are unequal and interlock in two
directions.
(diagrams/3_stacking/interlock.svg)
| Level |
NW bay |
NE bay |
SE bay |
| 4 |
B |
B |
B |
| 3 |
B, open to below |
B |
B |
| 2 |
B, tall room floor |
A, open to below |
A |
| 1 |
A |
A, tall room floor |
A |
- Loft A is the lesser one: two levels, four bays of
floor, about 670 sf. In return it has the 22 ft room on the north-east
corner, the one corner that sees both the river and downtown, with glass
on both faces.
- Loft B is the better one: three levels, six bays of
floor, about 1,000 sf, the top of the tower, and a 22 ft room on the
river side.
- B's tall room stands on A's low room and beside A's tall room; on
level 2 the two lofts share the floor.
- This was chosen over plain stacking (each loft a full floor, one
above the other) and over splitting the lofts above and below the
bridge, which needs a 125 ft bridge.
(
diagrams/3_stacking/variants.svg)
7. Two doors at the bridge.
(diagrams/4_plans/plan_bridge_level.svg) The bridge lands
on a covered landing, open to the bridge, in the east half of the stair
bay. Door 1 opens into loft A. Door 2 opens into the stair, which goes
up to loft B's own door on level 2 and down to the work level.
8. Massing: one plain block with the view corner carved
out. (diagrams/5_massing/massing.svg) Of five ways
of cutting the block, the carved corner is the one to develop: the
north-east corner, which sees both the river and downtown, is cut away
as loft A's balcony and is the building's one big move. Other openings
can be plain punched holes, which are good but standard. A slit in the
south wall is acceptable only if it does a job (light to the stair, say)
and only in that one place. Leaving a whole level open and setting the
top back were both rejected as too expensive for a building this
size.
9. The tower is dug into the slope.
(diagrams/6_ground/ground.svg) The block goes straight into
the bluff with no visible base, on drilled piers. The ground falls 7 ft
across the tower, from 529 ft at the uphill face to 522 ft at the
downhill face. The work floor is at 526 ft for now and may go lower: at
523 ft the downhill door is at grade with no steps and no fill, the
uphill wall holds back 6 ft of ground, and the work level is 18 ft high.
The work level has one door, on the downhill face, out of sight from the
cul-de-sac, and strip windows above head height for light. No other
openings at ground level. A level bench with a yard, and lifting the
tower on piers, were considered and set aside.
Areas
One bay is 168 sf. Counted to the bay lines, with no wall
thickness.
|
Bays of floor |
Area |
| Loft A |
4 |
670 sf |
| Loft B |
6 |
1,010 sf |
| Work level |
3 |
500 sf |
| Stair and landing |
1 per level |
170 sf per level |
| Whole tower |
5 levels of 672 sf |
3,360 sf |
Open
- Loft A's view is not exclusive: loft B has the same corner on levels
3 and 4, higher up, in ordinary 11 ft rooms.
- The tall rooms are 14 × 12 ft and 22 ft high, nearly twice as tall
as wide.
- The stair bay is a quarter of every floor. Baths and kitchens
probably share it.
- How far to dig in: work floor at 526 ft, 523 ft, or lower still. The
level table above still says 526 ft.
- What the built-in lifting machinery is and where it sits. Nothing
with wheels reaches the work door; everything arrives over the
bridge.
- Whether the stair shaft or service wall doubles as a wind tower, and
what that does to the top (see the wind catchers in
PRECEDENTS.md).
- Soil: the bluff is probably chalk at the top over shale lower down,
which would suit piers at the brow. From memory, not checked for this
lot.
- "One room per floor, services in the wall" does not fit decision 4
as drawn: four bays with the stair taking one of them is four small
rooms per floor, not one. Either the stair and services move into a
thick wall on the closed south side and each level becomes one room, or
the bays stay. This also changes how the lofts can interlock.
- Where loft A's balcony goes, and how loft B reaches the roof.
- Cladding, openings and structure: not started. The industrial
setting should drive them (see
PRECEDENTS.md).
- Where exactly the cul-de-sac pavement meets the south lot line, and
whether there is legal access from it.
site_plan.svg, section.svg and
axon.svg show the tower as a plain stack of two 22 ft
lofts. The outside size is the same; the inside is out of date.